Spring Lake Church
Green Bay, WI
Demolition, renovation, new construction; includes new audio-lighting-video projection systems.
|
| Above - Original sanctuary. The Church was originally constructed with the plan to renovate the sanctuary and expand it. When they decided it was time to move ahead with this phase, they all agreed it was time to upgrade their abilities (so they were able to do what they wanted to, how they wanted to in the room) and the appearance. The church held services in another local facility during the demolition-renovation-new construction time period. The church handled the installation of the audio, video and lightings systems with mostly their own labor force. We took care of the final system tuning. |
|
| Above - View of the new addition from accross the highway. |
|
| |
|
| Above - Smooth, even sound coverage to every seat, accompanied by dual-rear-projection video and a 2-look theatrical lighting system for the platform. |
|
| Above - Adjusting and aiming lighting fixtures. |
|
| Above - The video screens are high enough to be viewed with a clear line of sight. |
|
| |
|
| Above - The audio system patch panel and MASS connectors allows easy changes and for the system to be put on a cart and rolled out of the way in the future (when the room is converted into a gymnasium after the new sanctuary is built). |
|
| Above - Lighting system dimmer rack (before the dimmers were installed) |
|
| Above - Confidence projection screen. |
|
| Above - Side wall diffusion. |
|
| Above - In this room, two people can stand at opposite sides, talk in merely a whisper, but be heard by the other person. |
|
| Above & Following - First Sunday back in the facility. "It's good to be home." |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| Above - Lighting and video control room. |
|
| Above - New foyer and multipurpose hall. |

|